Tableau TDA-C01 - Tableau Certified Data Analyst Exam

Page:    1 / 20   
Total 97 questions

You are the owner of an alert.
You receive an email notification that the alert was suspended.
From where can you resume the suspended alert?

  • A. The My Content area of Tableau web pages
  • B. The Data Source page of Tableau Desktop
  • C. The Notifications area of Tableau Prep
  • D. The Shared with Me page


Answer : A

You have the following data source in Tableau Server.

You need to ensure that the data is updated every hour.
What should you select?

  • A. Extract Refreshes
  • B. New
  • C. Connected Workbooks
  • D. Connections


Answer : A

You have the following tiled dashboard that has one sheet.

You want to replace the sheet with Sheet2.
What should you do?

  • A. Right-click Sheet2 and select Add to Dashboard
  • B. Select Sheet3 and click the Swap Sheet button next to Sheet2
  • C. From the context menu of Sheet3. select Remove Dashboard Item
  • D. Drag Sheet2 to the dashboard
  • E. From the context menu of Sheet3: select Deselect


Answer : D

You have the following primary data source that contains a dimension named Dorm_Code.

You receive the following secondary data source that contains updated dorm codes.

You need to bring the updated dorm codes into Tableau and use the codes in existing visualizations. The new dorm codes must use the existing field name of Dorm_Code.
What should you do?

  • A. Bring in the secondary data source as a union.
  • B. Bring in the secondary table as a left join to the primary data source. From the Data Source page select Create Calculated Field in the Dorm_Name field and enter [Dorm_Name_New] in the calculation window.
  • C. Bring in the secondary data source by using relationships. From the Data pane, right-click Dorm_Name. select Replace References and then select Dorm_Name_New.
  • D. Create a data blend and select Edit Primary Aliases to replace the primary data source alias values with values from the secondary data source.


Answer : B

You plan to create a visualization that has a dual axis chart. The dual axis chart will contain a shape chart and a line chart. Both charts will use the same measure named Population on the axis.
You need to configure the shapes to be much larger than the line.
What should you do?

  • A. Duplicate Population Drag the duplicate to the second Marks card and configure the size of the marks independently
  • B. For the second axis, select Shape on the Marks card. From Select Shape Palette, select Custom, and then select Reset
  • C. Create a custom shape that is larger than the default shape and add the shape to the Shapes folder in My Repository.
  • D. Change Population to a discrete dimension.


Answer : A

Page:    1 / 20   
Total 97 questions