ASIS PSP - Physical Security Professional Exam

Page:    1 / 28   
Total 140 questions

Optimization of risk management techniques that remove the security problem by eliminating the risk is known as risk:

  • A. avoidance.
  • B. transfer.
  • C. reduction.
  • D. analysis.


Answer : A

A contractor that has installed a physical protection system should be required to repair, correct, or replace any defect for a minimum of:

  • A. 3 months.
  • B. 6 months.
  • C. 12 months.
  • D. 24 months.


Answer : D

During a security survey, the largest portion of field work involves:

  • A. evaluating or drawing conclusions.
  • B. analyzing hidden qualities, causes, or effects.
  • C. verifying accuracy or validity of data collected.
  • D. gathering data and accumulating evidence.


Answer : D

A project management team wants to use the best recognized way of understanding the true costs of a security system bid. Their best choice from the following list of methods is:

  • A. operating cost.
  • B. procurement cost.
  • C. installation cost.
  • D. life-cycle cost.


Answer : D

Reviewing qualifications, checking references, and interviewing staff are all examples of what bid practice?

  • A. Staffing plan analysis
  • B. Contract award
  • C. Vendor selection
  • D. Pre-bid conference


Answer : C

Page:    1 / 28   
Total 140 questions