iSQI ISEBSWTINT_001 - ISEB Software Testing Intermediate Exam

Page:    1 / 5   
Total 25 questions

Which one is a product risk associated with the air quality management system?

  • A. The system required to monitor oxygen levels may be more expensive than those required to monitor air temperatures.
  • B. SubsInc may need to recruit extra developers and testers to deliver the project on time.
  • C. Oxygen levels may reach dangerously low levels.
  • D. Extreme temperatures may lead to heat exhaustion of personnel.


Answer : C

Which of the following would be an entry criterion into site acceptance testing for the air quality monitoring system?

  • A. That the code written to fulfil the requirement to monitor carbon dioxide levels has been 100% path tested.
  • B. That the functional specification accurately reflects requirements R1 and R2.
  • C. That the system has been tested at levels of oxygen usage well beyond anticipated personnel levels.
  • D. That the requirements for temperature control have been signed-off.


Answer : C

Which of the following is an accurate depiction of the hierarchy of test management documentation (where the highest comes first)?

  • A. Test policy-Test strategy-Project test plan-System test plan
  • B. Test strategy-Test policy-Project test plan-System test plan
  • C. Test policy-Project test plan-Test strategy-System test plan
  • D. Project test plan-Test strategy-System test plan-Test policy


Answer : A

Which of the following test design techniques would be most suitable for testing that the oxygen is released at the required times?

  • A. Decision Testing.
  • B. Statement Testing.
  • C. Data flow Testing.
  • D. Boundary Value Analysis.


Answer : D

When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?
A. A walkthrough.
B. A technical review.
C. A management review.
D. A code inspection.



Answer : B Topic 2, Case Study # 2Scenario Your organization is a large media services corporation (MSC). MSC uses Agile development, within a Scrum framework. Here, the iterations are referred to as Sprints. For each Sprint, a set of user-stories is defined, built, and tested. The user-stories are typically 1- 2 lines long, indicating what the customer wants the system to do. MSC is in the process of updating its website to meet the recently introduced accessibility rules for websites. Accessibility means the availability of a system suitable to members of the public with, for example, visual or hearing difficulties. 1) Presentation of content with clear headings, short sentences, text versions always available. 2) Consistent navigation through the website. You are the test manager and there are four developers and two testers. You have all worked together previously, and are very experienced in MSCs products. Although the accessibility rules are new to you and the team, you have all attended a workshop where they were explained.

Page:    1 / 5   
Total 25 questions