Which of the following approaches provides the reliability necessary to support a tightly integrated manufacturing operation?

  • A. Preventive maintenance
  • B. Group technology
  • C. A kanban system
  • D. Computer-integrated manufacturing


Answer : A

Which of the following statements about high-volume repetitive manufacturing is true?

  • A. Machinery and workers must be flexible
  • B. Takt time is variable
  • C. There is very little stocking of intermediate assemblies
  • D. Throughput times are generally long


Answer : C

Objectives of implementing a work cell include which of the following outcomes?

  • A. Increasing worker satisfaction
  • B. Organizing resources by raw material type
  • C. Implementing standard work
  • D. Sharing common equipment


Answer : A

Which of the following statements about the MRP due date for a shop order is true?

  • A. It is the same as operation priority.
  • B. It is used in deriving operation priority.
  • C. It is established at order release time and frozen until order completion.
  • D. It is equal to the due date plus 5 "M" days.


Answer : B

A company produces a part with a nominal diameter of 2.0 inches and a tolerance of
0.006 with a standard deviation of 0.001 inches. A sample has the average diameter of
1.996 inches with a standard deviation of 0.001 inches. What is the CPK and process capability?

  • A. 0.667, capable
  • B. 0.667, not capable
  • C. 0.333, capable
  • D. 0.333, not capable


Answer : B