How do you ensure that PP/DS planned orders retain the end date and quantity of previously created SNP orders?

  • A. Enter the same value for the SNP production horizon and PP/DS horizon.
  • B. Activate "determine date and quantity based on SNP order" in Model and Version Management for PP/DS.
  • C. Use transaction /SAPAPO/SNP2PPDS or interactive function "SNP order conversion".
  • D. Maintain the SNP production horizon to start at least 1 day before the PP/DS horizon ends.


Answer : C

Which of the PP/DS options can you configure in Model and Version Management?
Note: There are 3 correct answers to this question.

  • A. Plan explosion
  • B. Available stock types
  • C. PP/DS horizon
  • D. No order without source of supply
  • E. Priority determination


Answer : C,D,E

Which group of options is possible in SCM GATP but not in ATP in ECC?

  • A. ATP check with checking horizon, ATP check at sublocation level, ATP check at batch level
  • B. Backorder processing, Automated mass ATP check, ATP check for deliveries
  • C. Check against ATP time series, Check against forecast, Check against allocation
  • D. Combined check of basic methods, Ability to trigger multilevel production, Rules-based ATP framework


Answer : D

In what situations do you use SAP SCM APO instead of SAP ECC PP?
Note: There are 3 correct answers to this question.

  • A. When MRP planning logic is mandatory during a planning run
  • B. When enhanced capacity planning capabilities are needed
  • C. When alert messages need to be updated in a planning session that has not been saved
  • D. When the low-level-code calculation is needed for all BOM structures
  • E. When dependent requirements need time stamp information


Answer : B,C,E

You want to define virtual safety stock within PP/DS.
Which statements correctly describe this kind of modeling?
Note: There are 3 correct answers to this question.

  • A. The virtual safety stock is only "virtually" visible for the MRP run and is not included in the pegging logic.
  • B. The virtual safety stock requires a separate PP/DS heuristic to become visible as a requirement during the MRP run.
  • C. The virtual safety stock is only considered in the dynamic pegging logic.
  • D. As soon as the material master has a safety stock value assigned, a virtual safety stock is considered during planning.
  • E. The virtual safety stock logic can only be defined for an entire planning version.


Answer : A,B,E