The technical completion of the current maintenance order was posted with a delay of 5 days.
What happens to the next planned date if you set the shift factor for early completion to 100%?

  • A. It is postponed by a full cycle (100%).
  • B. It is postponed by 5 days.
  • C. It is not shifted.
  • D. It will be 5 days earlier.


Answer : C

What can be determined using the offset within a maintenance strategy?

  • A. The basic start date of the maintenance order
  • B. The call date for the maintenance order
  • C. The first due date of a maintenance package
  • D. The scheduled start date of the maintenance order


Answer : C

Which scheduling parameters are used in a multiple-counter plan? (Choose two.)

  • A. Scheduling period
  • B. Start date
  • C. Scheduling indicator
  • D. Factory calendar


Answer : AB

How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by annual performance
  • B. Cycle length divided by ((scheduling period) x (cycle modification factor))
  • C. Cycle length divided by monthly performance
  • D. Cycle length divided by (annual performance / 365)


Answer : D

The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%. Which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. Planned end date of the maintenance order
  • B. Actual finish date of the maintenance order
  • C. Planned date of the next call, independent of maintenance order dates
  • D. Technical completion date of the maintenance order


Answer : D