Which piece of information gathered during a WLAN site survey should be included in the customer report?
Answer : E
A network engineer is preparing for an office site survey with a height of 2.5 meters. Which three components are recommended to complete the survey? (Choose three.)
Answer : C,D,E
Which two types of information must be included in the installation inventory portion of the post-installation report? (Choose two.)
Answer : A,B
An engineer is preparing for an indoor wireless LAN survey and is provisioning a survey kit.
Which three pieces of equipment should be included? (Choose three.)
Answer : B,D,E
Which two steps are associated with the active portion of the audit when a post-installation audit is performed with an auditing tool such as Ekahau? (Choose two.)
Answer : B,E